![](images/home.jpg)
當前位置:
首頁 > 信息發布>>精品工程
北京西北熱電中心京能燃氣熱電工程
創建日期2017-09-25瀏覽日期2024-06-23瀏覽次數4415
本產品(pin)為于合肥市石(shi)景山區地帶廣寧路10號,項(xiang)目(mu)建(jian)設人數(shu)為3×400MW級(ji)(F級(ji))然氣供(gong)水(shui)工作設備(bei).本建(jian)設工程于20多年(nian)0費改后(hou)開(kai)工建(jian)設,2018年(nian)5月(yue)“二(er)拖(tuo)一”工作設備(bei)每(mei)套通電1681天試運(yun)已來完(wan)成(cheng),2018年(nian)5月(yue)“一拖(tuo)一”工作設備(bei)每(mei)套通電1681天試運(yun)已來完(wan)成(cheng),獲“2016度歐洲轉(zhuan)型升級(ji)供(gong)用電技(ji)術大獎(jiang)”,獲選“2016-201七年(nian)度國家(jia)最好(hao)的資金有(you)點獎(jiang)”。
![](//125seo.com/scripts/ueditor/net/upload1//blob6346899.png)
The project is located in Guangning 10th Road, Shijingshan District,Beijing, consists of 3 × 400MW class (F) gas heating unit (3×300 MW gas turbine+300MW steam turbine+135MW steam turbine), started on September, the first unit put into operation in August 2014, the second unit put into operation in August 2014, was awarded "2016 Asia Innovative Power Technology Gold Award", and "2016-2017 Chinese Best Investment Special Award."
![](//125seo.com/scripts/ueditor/net/upload1//blob2210991.png)